Cost Estimation and Quantity Surveying Services

Sysmay Trading & Services: Your Trusted Partner in Metals and Beyond

Contact Us

Complete Cost Estimation, Quantity Surveying, and Budgeting Solutions for Industrial Projects

7

Cost Estimation of Structural Steel

Accurate cost analysis for structural steel materials, including fabrication, transportation, and installation costs.
Assessment based on current market prices and project-specific requirements for budgeting and planning.

Cost Estimation of Pressure Vessels

Detailed estimation for pressure vessel construction, including material costs, labor, and fabrication processes.
Calculations based on ASME codes and project specifications to ensure cost-effective solutions.

Cost Estimation of Tanks/Hoppers

Comprehensive cost analysis for tank and hopper designs, including raw materials, structural support, and additional systems.
Assessment tailored for API, UL, and custom design standards to meet industry-specific needs.

Cost Estimation of Piping

Precise costing of piping systems, considering material selection, pipe sizes, joint types, and installation.
Includes both installation and maintenance cost forecasts for various piping materials such as carbon steel and stainless steel.

Cost Estimation of Modular Skids

Estimation for the design, manufacturing, and assembly of modular skids, factoring in materials, labor, and transportation.
Tailored for industries requiring pre-fabricated, easily transportable, and quick-to-install systems.

Cost Estimation of Modules

Estimation of modular units, including materials, fabrication, assembly, and shipping costs.
Optimized for projects requiring prefabricated units for streamlined construction and reduced on-site labor.

FEED/Budgetary (+/- 30%)

Budget estimation during the Front-End Engineering Design (FEED) phase, typically with a variance of +/- 30%.
Used for initial budgeting and project planning, allowing for early-stage decision-making and adjustments.

Quantity Surveying

Detailed measurement and valuation of materials and labor required for the project.
Provides clients with precise quantities and cost estimates for all components, ensuring cost control throughout the project lifecycle.

MTO’s/BOQ’s

Material Take-Off (MTO) and Bill of Quantities (BOQ) preparation for efficient procurement and cost management.
Ensures that all materials required for the project are quantified and priced correctly for accurate budgeting.

Steel Products

Flanges Products

Steel Fittings Products

Bolts Products

Shipping Saddles Products

Reach Us Here!

2 + 9 =

Mail Us: info@sysmaytrading.com

(Support Mail)

Call Us: +966592213367

(Middle East)

Call Us: +918105871847

(India – Sales)